This job was awful. Possibly the worst part of the whole remodel so far. The tiles just wouldn't come up. I rented a jack hammer and my Dad and a friend Eric worked at it all day while I was at work. When I got home, 30% was still left, and it took me till very late to get that off. I don't think I took many pictures of that part. It was too frustrating.
The next day I rented a belt sander used for restoring hardwood floors and used it to get all the old grout off the floor. That was another big project.
Lastly, I used floor leveling compound on all the holes and gouges we put into the subfloor using the jackhammer and let that dry over night.
Powered by Blogger.